Hydro & Fish Diversion Project

fishteam

Breitenbush has a deep-seated commitment to hydroelectric power generated on-site from the Breitenbush River for all of our electrical needs. As a remote facility our alternative is burning diesel fuel, and the choice is clear! This past summer a hardy and creative crew, led by talented Breitenbush alumnus Conrad Zevely, dug into the massive and complex project of completing the fish diversion channel and screen which is now part of the hydro intake. With the completion of the new fish diversion system, fish will return swiftly and safely to the river, should they be drawn into the flume at the intake pond.For years, our old wooden flume carried river water to the powerhouse where it turned the turbine and generated the electricity for our retreat center and community village. This past summer, just as Phase 2 of the fish diversion project began, the old flume finally gave way, after lasting well over a decade longer than originally projected. Replacing the entire flume was added to the already huge project. As a community, we thank all of you who joined us at Breitenbush this summer, and gracefully accepted the dust and noise inevitable with construction of this scope. And grateful thanks to all the brilliant and dedicated folk who contributed their hard work: Michael F., Jefferson and their crew (for Phase 1), Conrad, Peter, Jeffrey Page, Thom, Cedric, Michael C., Paul, Joel, Choz, Gwen, Nigel, Eric, Jason, James, John, Helen, Mark, Tor, Brent, Don, Michael R., Josh, and the generous spirits of the land. We all look forward to the peaceful sustainability of our new hydro system.

Previous
Previous

The Hippies Got Ahold of Breitenbush!